<$BlogRSDURL$>

Tuesday, June 20, 2006

List 

Our new tenant moves in in 10 9 8 7 6 5 4 3 2 days. Here's what we have left to do: * Repair and texture the plaster in the back hall. * Paint the back hall and the second floor's access to the basement. * Finish the front porch railings. * Install smoke detectors. * Paint the front porch railings. * Have carpet installed in the living room and bedrooms. * Finish painting the folding doors and install them between the living room and front bedroom. * Install and paint the back bedroom door. * Put down subfloor and tile in the kitchen and bathroom. * Install the toilet in the bathroom. * Install the vanity and sink and faucet in the bathroom. * Install the medicine cabinet in the bathroom. * Put in bathroom lights, finishing pieces of exhaust fan, and switches/switchplate. * Buy and put in the refrigerator and stove. * Install blinds in the kitchen. * Finish the small amount of mudding and taping in the kitchen built-in, and sand, prime and paint, then install shelf paper. * Put tile in the bedroom closets. * Install chair railing in the bathroom. * Paint the bathroom. * Power wash and paint the second floor access stairs and doors and the foundation for the rest of the house. * Clean up the yard. * Get an electrical inspection, and two occupancy inspections. * Change furnace filters. * Put in wash tub drain for the downstairs utility sinks (which now currently just dump water on the floor.) I am alternately worried about the amount of work, and exhausted by it. The good thing is - one way or another, it will be over in 10 days. And the other good thing is - I have not given a thought to my state exam scores! (What state exam scores??)
Comments: Post a Comment